Restoration of an existing floating marina after significant damage was sustained during the 2018 flooding of the Colorado and Pedernales Rivers. Civil and structural finite-element engineering analysis was performed to quantify and resist flood and impact loads. Commercial marina insurance was re-instated based on the retrofit and the reinforcing of the structure specified within our repair drawings.